re_mvrhs_building_tour_analog_phone_system_032326_019
Electrical closet is a tangle of wires. - Ray Ewing

Failing ventilators. Leaking ceilings. Crumbling floor tiles. Unheated classrooms. Persistent mold.

After more than 65 years as the Island’s only comprehensive school for students from all towns, Martha’s Vineyard Regional High School has some very expensive problems that can be solved only with money.

The $333.5 million building project, which will exceed $400 million when adding in debt service, comes before Vineyard voters on June 2. The plan is to demolish the original 1959 building, remodel the 1990s addition and build a new, two-story classroom wing.

The result would increase the size of the school from 165,000 square feet to just under 200,000 square feet, without displacing its more than 700 students to modular classrooms during the 18-month construction period.

From the outside, it can be hard to see why Martha’s Vineyard school and community leaders are seeking such an extensive renovation and addition in the first place. The high school’s standardized-test scores are respectable, its sports teams and performing arts groups draw Islandwide crowds and its senior classes collect a trove of college and training scholarships every year.

Inside the school, it’s clear that the community is strong, with teachers and students exchanging grins and banter in the hallways and cafeteria. Take a closer look, however, and the building itself is riddled with countless marks of age and obsolescence.

As the Gazette toured the school on Monday, a glimpse into its main computer server room — basically a two-story-tall-utility closet — revealed a tangled nest of analog telephone wiring, in stark contrast to the sleek, black server cabinet that runs the school’s digital systems.

To prevent overheating, the school has installed four separate mini-split heat pumps in the crowded space — a necessary redundancy in case one or more of them fails.

“If this room gets too hot in the summer, everything will shut down,” said high school administrator Sam Hart.

Mechanical systems have failed throughout the school. Some classrooms have no working heat, with teachers resorting to plug-in space heaters and even, in the culinary teaching kitchen, open flames from the gas-burning stoves to keep their students warm.

Ventilation is deficient in many places, including the automotive career training center, which also lacks such environmental controls as a runoff tank, an oil-water separator and spill-resistant flooring.

On Monday, rainwater was dripping through the automotive center’s ceiling onto the concrete floor. It’s one of the many leaks that have stained ceiling tiles throughout the school.

In the health assisting classroom — half filled by desks and chairs, with dummy patients in hospital beds taking up the rest of the crowded space — the intake grid of a floor ventilator is thick with fuzzy mold, and the floor tiles appear to be dissolving.

Special education classes are taking place in a former home economics room, complete with a kitchen, and in the former business classroom, which still has a door to the student store.

Neither of these rooms is large enough for the special education students’ needs, Mr. Hart said, so at times the outside corridor is used as well.

The building project would be less costly if Martha’s Vineyard Regional were not a comprehensive high school, with career training, special education and the arts as well as traditional academics. Islanders made the choice in the 1950s to have all of their children, regardless of post-graduate plans and individual learning needs, educated at one high school, Mr. Hart said.

But as the Vineyard’s population has grown and changed, school administrators repeatedly have had to “rob Peter to pay Paul,” Mr. Hart said, swapping classrooms and repurposing other spaces to accommodate the shifting needs of a larger student body.

State education rules are driving much of the high construction costs, Mr. Hart said — and the Massachusetts School Building Authority (MSBA) is unlikely to reimburse schools for building projects that don’t meet the state standards for classroom size, ruling out the possibility of economizing on space.

“We actually argued to the state that we didn’t need to meet the 825-square-foot-per-classroom requirement, that we could go 775, and they said no,” Mr. Hart said.

The MSBA has pledged to reimburse more than $70 million of the renovation and addition, but the remaining total still would make it the most expensive public building in Martha’s Vineyard history.

A simple makeover of the existing school would have cost about $200 million, with construction lasting more than two years and requiring expensive modular classrooms, Mr. Hart said.

Some Island voters and town leaders are gasping at the project cost, which is set to be shared among the six towns in an agreement signed four years ago and would raise property taxes for 30 years beginning in 2028.

If the measure fails at the ballot box, the capital repairs will still be needed — and they’ll only get more expensive, while the state’s $70 million offer will be off the table for good, Mr. Hart said.

“There’ll be big-ticket items before [town meeting] voters for the next five years,” if the project doesn’t pass in June, he said.

Part of the high price tag for the school can be chalked up to the often-cited “Vineyard factor,” which building project managers have said adds about 30 per cent per square foot due to the cost of bringing materials and skilled workers to the Island.

Also, school building costs are soaring throughout the state. A recent Boston Herald report found that average construction costs for schools had increased about 59 per cent over the past five years, compared to a 37 per cent increase for other buildings during the same time period.

The MSBA approved a $659 million high school project in Lexington last year and a new, $447 million Salem High School last month, while a proposed vocational school in Boston is estimated at more than $700 million, according to the Herald report.

The Vineyard is not facing the steep decline in enrollment that other rural Massachusetts school districts have suffered in recent years. While a recent Boston Globe article cited a 30 per cent decline in rural enrollments over the past 25 years, compared to a 7 per cent drop in other Massachusetts districts, Martha’s Vineyard enrollments — measured by the annual Oct. 1 school census — have remained fairly steady.

The number of students in Island public schools has dropped by only 18 between 2007, when there were 2,120, to last fall, when 2,102 were counted.

Enrollment at the high school fell to 704 last fall and looks be similar in 2026-2027, as the town school pipeline currently includes nearly as many eighth-graders (174) as there are high school seniors (178).

Future freshmen who are now in town schools include the high school class of 2033, currently 189 fifth-graders strong.

The new school is designed for a student body of about 800, but teenagers aren’t the only ones who go to Martha’s Vineyard Regional High School.

On nights and weekends, the school hosts classes for adults seeking professional skills and certifications and also offers recreational activities like evening ping-pong.

“It’s like a giant community center — so many people use it, and so many different Island organizations,” said teacher Elsbeth Todd, a member of the building committee.

The new school design, by Tappé Architects, emphasizes the community-center aspect by placing the main entrance in front of the performing arts center, with a glass-enclosed, two-level lobby and doors into the theatre from the first and second floors.

The culinary arts center would be adjacent to the lobby, with a concession window for the new grass playing field just outside.

Game spectators also would have access to indoor bathrooms, Mr. Hart said.

The adjoining two-story classroom wing would be built around a central, private courtyard for student and teacher use.

The high school building committee, a group of about two dozen town, school and community representatives who have been working on the project for the past three years, has posted the design on its website: mvrhsbuildingproject.info.

The committee also is hosting a series of public information sessions where Islanders can ask questions and learn more details about the project.

The next session is scheduled for April 29 at the West Tisbury Library, followed by a session April 30 at the Tisbury Council on Aging and two more at the West Tisbury Library on May 13 and May 28.

Join the Conversation

14 Comments

  1. According to the article, “Part of the high price tag for the school can be chalked up to the often-cited ‘Vineyard factor, which building project managers have said adds about 30 per cent per square foot due to the cost of bringing materials and skilled workers to the Island.”

    Is there any potential to use MVRHS students in the building trades program for part of the construction labor? Could be a cost-saving measure, as well as valuable and relevant learning experience for vocational students…

    1. I wish people would stop suggesting using students from our CTE programs to do work that needs to be done by professionals. It has been mentioned regarding the new school and the fields. People, you don’t use student labor to get out of paying for a new school. It is a municipal building projects, have you ever heard of prevailing wage laws? The school is our largest Island Wide building used by people from every town. Don’t cheap out. This should be the pride of the island, not the laughing stock.

  2. Farrrrrrrrr to expensive… A stitch in time saves 9…..It seems insane to me that this many problems have been aloud to go on for a number of years…..My vote will be come up with another plan….We will have a beautiful Y across the street with many opportunities for the students interest….Let’s focus of the potential numbers of students in the future as it is predicted to go down. Stop the madness….We have a great school,

  3. This is pure neglect. who signs off on this shoddy work? If the maintenance was done correctly, this school wouldn’t be in disrepair. Same thing will happen to the new school unless there is a yearly budget for repairs

    1. My thoughts exactly.
      Lack of required maintenance has created this problem that will burden the island tax payers for 30 years. By that time the same lack of required maintenance will require another substantial renovation. Very disturbing how our island fathers have gone about this.

    2. The same people who complain about the cost of a new school are the same ones who would complain at town meeting about increased school costs due to maintenance.

  4. Why is anyone surprised that a 65 year old school needs to be completely replaced? You can’t bandaid away these infrastructure problems, as we are witnessing. The price tag is obscene, but there are no viable options here. We have to take care of our students, teachers, and everyone else who works in the building for the next several generations. They cannot continue with mold, no heat and failing systems. We neglected this facility for decades, now the chickens have come home to roost. Time to put our money where our mouths are and invest in these kids and the future. It’s the least we can do after leaving them a with crushing federal debt and a climate crisis.

  5. I spent my entire working career in the trades, ten years as a carpenter the the following thirty eight years running my own construction company.
    The issues with the high school are not just maintenance the building is just worn out. I asked my friend Mike Taus when he was the facility manage me to show the problems he had found.
    We went one hundred feet down a hall, we didn’t need to go farther. The windows and doors need to be replaced, the electrical, plumbing, HVAC system are substandard, the roof needs to be replaced, there is mold everywhere, the building has reached it’s end. An example would be one of the hot water boilers wasn’t working. Mike removed the part that need to be replaced and went to Plumbers supply to buy a replacement. Plumbers Supply not only didn’t have the part, they had never heard of the company that made the boiler. Mike had to get a machinist to custom make the part. The simple fact is we are faced with a choice are our island children more important than the money required to replace the existing high school building. I will be voting at Edgartown’s meeting for the school project. In my professional opinion the building committee have done a wonderful job and our children deserve the design put forth.

  6. Gerald, I like your comment. If they did repairs on time and scheduled maintenance they would not end up like this. It’s gonna happen same thing after 10yrs when they build new one.

  7. This article of projected costs for a new regional high school proves that if maintenance is not improved the funds will be wasted. It will not be maintained and in a few decades another building will be needed to be built with taxpayer funds? As a taxpayer I am not excited over this possibility.

  8. Thats not a regular electrical room with high voltage wires. That is a room filled with phone wires,computer,equipment wires and probably fiber optic wires,a real electrical room wouldn’t have all that garbage hanging out

    1. The school has no high voltage.
      Have you seen the low voltage power wiring?
      What is pictured is not garbage.
      it is old phone wires, computer, equipment wires and fiber optic cables.

  9. If a stabilization fund is not created from the start of this project, maintenance will be deferred. it must be marked for. repairs only, because they will steal from it for raises, classroom help etc. the projected cost should be included in the Loan. Lets have the truth upfront

Leave a comment

Your email address will not be published. Required fields are marked *