Construction is beginning on the drawbridge at the entrance to Lagoon Pond, straddling the border between Oak Bluffs and Tisbury. I’d like to bring everyone up to date on the status of the overall project and note some of the issues that the Vineyard community will have to deal with in the coming months.
As you probably recall, MassHighway’s approach is to first build a temporary bridge alongside the existing bridge, in order to reroute traffic. Then, a permanent drawbridge will be built in the alignment of the existing bridge.