Noah Asimow
Critically endangered North Atlantic right whales are increasing their presence in waters south of Martha’s Vineyard, according to a recent study, including large swaths of ocean slated for wind energy development.

2024

The Biden administration approved plans to build a 141-turbine wind farm south of the Vineyard last week as another project off the Island’s coast appeared to be stalling out. 

The construction marks the first blade work in five months after one doubled over and scattered thousands of pieces of debris into the water in July. 

A panel of judges with the U.S. First Circuit Court of Appeals upheld a lower court’s decision on Dec. 5, saying claims that the federal government mishandled the approval process for the wind farm were unfounded. 

Donald Trump, who has long railed against wind turbines, threatened to halt the industry on “day one” of his presidency throughout his campaign, raising concerns for advocates who feel wind energy is a major factor in meeting state and federal climate goals.

GE Vernova, the manufacturer of the blades for the wind farm south of the Island, said Wednesday that it intends to remove more turbine blades as a precautionary measure, while taking steps to strengthen others.

GE Vernova, the manufacturer of the blade that doubled over in July and poured down into the sea, had vessels at the malfunctioning turbine Sunday with the goal of retrieving the large pieces of the 305-foot blade.

Pages